【导读】福建成考网小编为大家带来2018年福建成考专升本英语考前习题及答案3
Passage Four
A few years ago, Paul Gerner began to gather a group of architects in Las vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning . ”I think half of then fell off their chairs,” Gerner says.
Gerner manages school facilities (设施)for Clark county, Nevada, a district roughly the size of Massachusetts. By 2018, 143, 000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (样品) ; They plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. ”One of the biggest challenges is getting the right site orientation(朝向), ” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of re most progressive green-design competitions has doubts about ideas of eco-friendly buildings. ”I don‘t believe in the new green religion,” Gerner says. ”Gerner says.”Some of the building technologies that you get are impractical. I‘m interested in those that work. ”But he wouldn‘t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. ”You never know what‘s going to start the interest of a child to study math and science,”he says.
48.How did the architects react to Garner‘s design requirements?
A. They lost balance in excitement.
B. they showed strong disbelief.
C. they expressed little interest.
D. they burst into cheers.
49.Which order of steps is followed in carrying out the project?
A. Assessment-Prototype-Design-Construction.
B. Assessment-Design-Prototype-Construction.
C. Design-Assessment-Prototype-Construction.
D. Design-Prototype-Assessment-Construction.
50.What makes it difficult to build green schools in Clark County?
A. The large size.
B. Limited facilities.
C. The desert climate.
D. Poor natural resources.
51.What does Gerner think of the ideas of green schools?
A. They are questionable. C. They are advanced.
B. They are out of date. D. They are practical.
【参考答案】
Ⅳ.36~39 DADB 40~43 BCBC 44~47 ADAC 48~51 BDCA
声明:
(一)由于考试政策等各方面情况的不断调整与变化,本网站所提供的考试信息仅供参考,请以权威部门公布的正式信息为准。
(二)本网站在文章内容来源出处标注为其他平台的稿件均为转载稿,免费转载出于非商业性学习目的,版权归原作者所有。如您对内容、版权等问题存在异议请与本站联系,我们会及时进行处理解决。
关注公众号
回复“免费资料”领取复习资料
微信公众号
微信交流群
<<点击收起
13950208961